Client
Date
Location
Budget
Needs
Orbital Marine Power (then Scotrenewables) was assessing a site on the Paraná River, downstream of the Itaipu dam, for its run-of-river turbines. Currents of around 2 m/s were expected, but their distribution along and across the river reach was unknown. The feasibility study needed an independent current survey following a methodology agreed beforehand.
Objectives
Measure the current velocity profile over the whole river reach under study
Map the spatial distribution of current speeds to locate the most energetic areas
Check whether currents vary from one day to the next
Missions
Resources deployed
Teledyne RDI Workhorse Sentinel 600 kHz ADCP, single-ping in beam coordinates with 1 m cells
Side-mounted pole on the survey boat, transducer about 1 m below the surface
Hemisphere V100 GPS for position and heading, acquisition with VmDas
Zigzag survey route, with every second transect perpendicular to the banks
Results
- Velocity profiles measured along the planned route over the river reach
- Map of current speeds identifying the most energetic areas for turbine deployment
- Measured dataset provided as input to the feasibility study for the river turbine installation