Client
Date
Location
Budget
Needs
The Isle of Luing community was exploring a tidal energy project in Cuan Sound, the narrow channel between the islands of Luing and Seil on the west coast of Scotland. Before going further, the islanders needed measured data on how tidal currents vary across and along the channel, and a first estimate of the energy that could be extracted.
Objectives
Map tidal currents across and along Cuan Sound at spring and neap tides
Relate the flow to the water levels at both ends of the channel
Identify the most promising area for turbines and give a first estimate of the energy potential
Missions
Resources deployed
Teledyne RDI Monitor 600 kHz ADCP on a pole, with a directional GPS, on a local vessel
Two NKE SP2T pressure and temperature recorders, one 1-minute burst every 15 minutes
Detailed transects 75 m apart, combined with 2 m resolution UKHO bathymetry
Processing with VmDAS, WinADCP and DynamOcean's in-house Matlab tools
Results
35
days of water level records
75 m
spacing between detailed transects
4 MW
theoretical mean extractable power
2 MW
technical mean power estimate
- Very good quality current data, with current peaks occurring at the same time as peaks in the water level difference across the sound
- Best location identified in the narrowest and shallowest part of the channel, favourable to both ebb and flood
- Area around Cleit Rock found less promising, with a strong vertical gradient and variable current direction
- About 4 MW of theoretical mean extractable power and 2 MW at technical level, for example six 1 MW turbines
- Gridded current data delivered for the next steps: numerical modelling and array layout optimisation
Our added value
DynamOcean combined the tide gauge and ADCP data to show that the water level difference across the sound drives the flow, then predicted discharge and power over 20 years. This gave the community a first estimate of annual energy production from only three days of current surveys.