Viability assessment of river hydrokinetic turbines on the Artibonite River, Haiti

2013 - 2014
12 June 2014 by
Viability assessment of river hydrokinetic turbines on the Artibonite River, Haiti
DYNAMOCEAN, Eloi Droniou
Client logo: IDB (Inter-American Development Bank)

Client

IDB (Inter-American Development Bank)

Date

2013 - 2014

Location

Artibonite River, Haiti

Budget

c. €30k

Needs

The Peligre hydroelectric dam on the Artibonite, Haiti's main river, mostly supplies the capital, while nearby villages are still not connected to the grid. The Inter-American Development Bank (IDB) wanted to know whether small in-stream river turbines downstream of the dam could supplement its output or supply these rural areas directly. This required measured flow velocities and depths, and an up-to-date view of available technologies.

Objectives

01

Measure flow velocity and depth at the most promising sites downstream of the Peligre dam

02

Check the sites against viability thresholds for river hydrokinetic turbines

03

Estimate the installable capacity of pilot turbine farms

04

Recommend the further studies needed to move the project forward

Missions

01 Survey planning and testing of all equipment before shipping to a remote site
02 Velocity and depth transects with a current profiler on a tethered tri-hull boat at five sites
03 Quality control, spatial averaging and GIS integration of the data
04 Resource assessment with a farm method and proposed turbine layouts, based on a technology review by Aquatera
05 Final report with recommendations for further studies

Resources deployed

Teledyne RDI RiverRay ADCP in a tri-hull riverboat, coupled with a Hemisphere GNSS receiver

Rope system across the river and Bluetooth link to a shore-based laptop for real-time quality control

Acquisition and processing with WinRiver II, results integrated into a GIS

Four days of survey in early December 2013, at the start of the dry season

ADCP tri-hull boat tethered across the river for a velocity transect

ADCP tri-hull boat tethered across the river for a velocity transect

View of the Artibonite River valley during the dry season

View of the Artibonite River valley during the dry season

Results

5

sites surveyed

3

sites above the viability thresholds

3.5 m/s

maximum flow velocity measured

c. 90 kW

estimated installed capacity

  • Three of the five sites exceed the thresholds of 2 m/s velocity and 1.5 m depth
  • Fastest flows found just downstream of the Peligre and Canneau dams, with depths around 2 m
  • Measurements made at the minimum dam release of 50 m³/s, so measured velocities are likely the lowest of the year
  • Three pilot farms proposed with a commercially available 5 kW turbine, for about 90 kW in total and a potentially very high capacity factor
  • Recommendations on long-term discharge data, numerical modelling, flood and sediment risks, and turbulence measurements

Our added value

Beyond the hydrokinetic assessment, DynamOcean identified the potential of retrofitting conventional low-head hydropower at the Canneau irrigation dam and its canal intakes, and recommended assessing this option.