Skip to Content

Real-time tidal resource monitoring for Flumill turbine validation at EMEC

2012
27 May 2014 by
Real-time tidal resource monitoring for Flumill turbine validation at EMEC
Client logo: Aquatera

Client

Aquatera

Date

2012

Location

Shapinsay Sound, Orkney, Scotland

Budget

c. €5k

Needs

Flumill needed flow and wave measurements at a temporary test site in Shapinsay Sound, just north of EMEC's nursery site, to test its tidal turbine and assess its performance. Earlier data from the nursery site showed currents up to 1.2 m/s with strong eddies, so a more energetic and stable location had to be found first, then monitored while the device was operating.

Objectives

01

Locate an area of the channel with suitable and stable flow for the trials

02

Confirm the chosen location and predict currents for the testing period

03

Measure the flow near the operating turbine to support its performance validation

Missions

01 Specification of the flow monitoring set-up and work plan for the Shapinsay Sound test site
02 Vessel-mounted ADCP survey along four lines repeated hourly across the channel
03 Seabed ADCP deployments: one at the planned turbine position, one monitoring during device operation
04 Quality control, despiking and bin mapping of the single-ping data
05 Comparison of the monitoring data with predictions at the turbine position

Resources deployed

Teledyne RDI Workhorse Sentinel 600 kHz ADCP, pole-mounted for the vessel survey

Seabed frame for the same ADCP, single-ping recording every 0.5 s in 1 m cells

Local workboat with deck crane, navigation software displaying survey lines to the helmsman

WinRiver II for transects, in-house Matlab tools for quality control and analysis

Side-mounted ADCP pole on the survey vessel

Side-mounted ADCP pole on the survey vessel

Survey lines displayed for the helmsman during the ADCP transects

Survey lines displayed for the helmsman during the ADCP transects

Deck crane ready for the seabed ADCP frame deployment

Deck crane ready for the seabed ADCP frame deployment

Results

68

vessel-mounted ADCP transects

2

seabed ADCP deployments

25 h

of monitoring during turbine operation

  • Vessel survey narrowed down the turbine location to a more energetic part of the channel
  • Seabed survey confirmed the flow at the chosen position and gave current predictions for the trials
  • Monitoring data quality-controlled and delivered with predictions in a single spreadsheet
  • Very good agreement between measurements and predictions on one flood, discrepancies explained on the others
  • Recommendations for future trials: simultaneous measurements at turbine and monitoring positions, 30-day survey

Our added value

Beyond quality control, DynamOcean compared the monitoring data with the predictions made at the turbine position and explained the differences. It then recommended a method for future trials, with simultaneous pre-installation measurements, to transfer the measured flow reliably to the turbine.