
Client
Date
Location
Budget
Needs
Aquatera was supporting Tidal Bridge Indonesia in assessing Larantuka Strait, between Flores and Adonara, as a candidate site for tidal stream energy along a planned bridge alignment. The project needed current measurements showing how the flow varies across the strait and how it evolves over the tidal cycle at the target location. The surveys were to be carried out by a local contractor, who required expert support to set up the ADCPs.
Objectives
Define a survey strategy combining vessel-mounted transects and a seabed-mounted ADCP
Map the spatial variability of tidal currents across the strait and around the planned bridge alignment
Record the variation of currents at one point over about a month to support power output estimates
Ensure the local contractor could acquire good-quality ADCP data
Missions
Resources deployed
Teledyne RDI Workhorse 600 kHz ADCP mounted on the survey vessel, with VmDas acquisition software
Teledyne RDI Workhorse Sentinel 600 kHz ADCP on the seabed, configured for a deployment of about 32 days
Tide predictions and satellite imagery used to plan transects and survey windows
Remote support from France to the survey team in Indonesia
Results
- Survey plan combining cross-channel transects and a fixed measurement point on the planned bridge alignment
- Ready-to-use ADCP configurations delivered to the local contractor
- Survey design allowing both the spatial pattern and the tidal variation of the flow to be characterised
- Measurement approach designed to feed an estimate of annual power output from a turbine power curve